Results: Costs Comparison of Bedding Material

When comparing the cost of the two bedding materials, several items were considered. Table 3 lists the cost of getting the bedding material into the barn storage area.

The initial cost of the pelleted bedding for this project was 15 times more expensive than the sawdust bedding on a weight basis, but only 6 times more expensive on a volume basis.

Table 4 shows that the amount of sawdust used for bedding on a weight basis was almost 1.5 times as much as the pellets, while on a volume basis, 4 times as much sawdust was used. The difference in amount of bedding used for the year was calculated at 20 cubic yards.

The amount of labor to clean the stalls shown in Table 5 was only slightly different, with the sawdust taking about half a minute more per day to clean. A greater discrepancy in time was observed between mares and geldings. It was observed that at the end of the week, the pelleted bedded stalls were dustier than the sawdust bedded stalls.

When considering the initial cost, the amount of bedding used and the amount of manure removed from stalls, the break-even cost of manure disposal would be $350 per ton or $110 per cubic yard.

Table 3: Comparison of Cost on a Weight and Volume Basis

Sawdust

Pellet

7.5 ton load

130 bags (30#)

(840 cu.ft.)

(133 cu.ft.)

Labor

$ 20.00

Transportation

$ 10.00

Material

$ 116.25

$ 552.50

Total

$ 146.25

$ 552.50

Cost per ton

$ 19.50

$ 283.33

Cost per cu.ft.

$ 4.86

$ 112.16

 

Table 4: Amount of Bedding Used

Sawdust

Pellets

weight

volume

weight

volume

lbs.

cu ft

lbs.

cu ft

Total for week

2173.0

139.0

1498.0

33.5

Average for week

217.3

13.9

149.8

3.4

Mare Average for week

222.6

13.6

164.0

3.5

Gelding Average for week

212.0

14.2

135.6

3.2

Average per day

36.2

2.3

25.0

0.6

Average for year

11300

723

7790

174

tons

5.6

3.9

cu.yd.

26.8

6.5

 

Table 5: Time to Clean Stalls

Minutes

Per stall per day

Sawdust

Pellets

Mare

12.6

12.2

Gelding

14.8

14.5

Average

27.4

26.7

Sawdust vs. Pellet

0.7

Minutes per day

4.3

Hours per year

Gelding vs. Mare

4.5

Minutes per day

27.4

Hours per year

 

Table 6: Comparison of Total Cost per Year

Sawdust

Pellets

Weight Basis (Tons)

Initial Cost

$ 19.50

$ 283.33

Amount Used

5.6

3.9

Final Cost

$ 109

$ 1,105

Volume Basis (Cu.Yd.)

Initial Cost

$ 4.86

$ 28.89

Amount Used

26.8

6.5

Final Cost

$ 130

$ 188